In facilities with overhead cranes, maintenance and repair work on the crane involves a serious risk of falling. In these demanding work environments, using the right system is vital.

  • Lifelines take up very little space, making them ideal for providing fall protection in narrow work areas.
  • They can be installed along crane runways and on top of the crane itself.
  • XTR Safety lifelines can be fixed to concrete or steel structures.
  • Uninterrupted movement along crane walkways is essential. Thanks to the specially designed XTR Safety trolley, users can pass intermediate brackets without disconnecting from the system.
  • 4-User Capacity
  • 25-Year Warranty
  • Current European Standards
  • Easy Installation
  • Stainless Steel & Aluminum

25-Year Warranty

XTR Safety fall protection systems are covered by a 25-year manufacturer’s warranty against manufacturing defects (15 years for X-WALK walkways and X-GUARD guardrails).

Stainless Steel & Aluminum

XTR Safety products are made of stainless steel and aluminum with high corrosion resistance.

Insurance

All our manufacturing and installation work is covered by professional liability insurance.

Where is the lifeline installed on cranes and crane walkways?2026-11-21T11:59:35+03:00

In facilities with overhead cranes, lifelines are required for safe work on the crane itself and on the crane walkways used to reach it.

On crane walkways, the lifeline is fixed to the building columns. Through-bolting into concrete or steel columns is a safe method and should be preferred. Clamp fixings on columns may be damaged over time by crane vibration, which could compromise the safety of the lifeline.

Installing the lifeline at a high level above the crane walkway minimises the fall distance and ensures that a fall is arrested safely within a shorter distance.

For work on the crane itself, the lifeline is installed on at least one crane girder using suitable anchor posts and brackets, taking into account the steel wall thickness, the crab trolley and its travel area, and other equipment on the girders. Mechanical (bolted) fixing should be preferred on cranes.