In facilities with overhead cranes, the use of lifelines is necessary for safe operation on the crane and on the crane walkways used to reach the crane.

The installation of lifelines on the crane walkway is done on columns. Installation by drilling through concrete/steel columns is safe and should be preferred. In the case of installation on columns using specially designed clamps, damage may occur over time due to vibration in the crane walkway, which could put the safety of the lifeline at risk.

The installation of the lifeline to be installed on the head of the crane walkways will minimize the fall distance in case of a possible fall and ensure that the fall is stopped safely and at a shorter distance.

In the works carried out on the crane, the wall thickness of the crane steel, the structure and movement area of the crane trolley, the anchor bollard, riser bracket, etc. on at least one beam, taking into account the other elements on the beams. lifeline is assembled using complementary anchor legs. Mechanical installation should be preferred for installation on the crane.